Commissioning Process of a Bus Bar Trunking (BBT) Project

Commissioning Process

Every Electrical type of equipment has an individual installation and commissioning process. In case Busbar Trunking (BBT) System, there are some test need to do just after completing the Installation. In my previous blog, I have discussed in details regarding the test before power up or Just after installation which is known as a cold commissioning test.

Test and Checklist Before Going to Power Up a Busbar Trunking (BBT) System, You MUST DO!!!

Commissioning After Giving Power Through BBT

There are some other tests should need to do after power-up that is called hot commissioning. Those tests are:
  1. No Load Test
  2. Full Load Test
  3. Temperature Rise Test
Details will be in NEXT Blog.  