Template of Checklist For Any BBT Project


TEMPLATE OF CHECKLIST OF A BBT PROJECT

Customers Name / Company
Factory Address with Location
Factory Contact Persons
Contact Number
Inspection Date
BUSBAR TRUNKING SYSTEM DETAILS (ELECTRICAL):
BBT Rating
BBT Type ❒ Aluminum  ❒ Cupper ❒ Both
Installation Type ❒ Vertical ❒ Horizontal ❒ Both
BBT Classification ❒ Power BBT  ❒ Lighting BBT
❒ Machine BBT ❒ Trolley BBT
Year of Manufacturing
Model Number
VISUAL INSPECTION: RECOM.
Encloser Colour Ok ❒ Yes ❒ No
Hanging Arrangement ❒ Yes ❒ No
Cleanliness ❒ Yes ❒ No
Tap off Box Joint ❒ Yes ❒ No
BBT Joint Cover ❒ Yes ❒ No
BBT End Cap  ❒ Yes ❒ No
Chance of Water Injection ❒ Yes ❒ No
BBT Cross over with any water pipe ❒ Yes ❒ No
INSTALLATION CHECKLIST RECOM.
1. Inspect all elements on receipt and ensure that neither the conductors nor their insulation have been damaged during handling and/or storage. ❒ Yes ❒ No
2. Install the elements in accordance with the planned layout as indicated in the installation drawings supplied. ❒ Yes ❒ No
3, Ensure that the spacing between adjoining elements is correct. ❒ Yes ❒ No
4. Check the insulation resistance of the layout. No other equipment (tap-off units, end feed units, etc.) must be connected at this time. ❒ Yes ❒ No
5. Place the covers on the mechanical junctions (see Connecting units) ❒ Yes ❒ No
6. BBT connection with DB/LT/Transformer/Generator:
Sufficient capacity Busbar used and tighten
❒ Yes ❒ No
7. Vibration and other safety measure checked ❒ Yes ❒ No
8. TAP- OFF Box and Joint boxes installed and tighten as recommended  ❒ Yes ❒ No
8. All tap-off boxes are good condition and checked operation  ❒ Yes ❒ No
10. BBT is not bent after tap-off boxes installation ❒ Yes ❒ No
11. Earthing connection done as recommended and earthing resistance is equal to or less than 01 ohms. ❒ Yes ❒ No

No comments